Skip to content
APEFORGOOD

For HOAs & apartment communities

A meeting point for the shared green.

Playground projects for HOAs, condo associations and property managers: from site visit to installation and documents. A clear plan you can present to the board and residents.

Request a project quote
Ages 1–3 Ages 3–6 Ages 6–12

For boards & property managers

  • Clear scopeEquipment, surfacing, installation and documents in a single proposal.
  • A plan ready to presentLayout plans and drawings you can share with the board and residents.
  • Many ages, one spaceSeparate areas for little and big kids around a shared green.
  • Care planAnnual inspection and maintenance plans available.

Project stages

  1. 01

    Site visit

    We measure the site and look at the existing ground, drainage and surroundings.

  2. 02

    Design

    Age zoning, equipment selection, use zones and surfacing.

  3. 03

    Approval

    Plan and scope signed off with your director, board or management.

  4. 04

    Production

    Built to the approved design.

  5. 05

    Installation

    Ground prep, surfacing and assembly.

  6. 06

    Documents & care

    Handover documents, inspection checklists and a maintenance plan.

Typical timeline: 6–12 weeks from approval to installation; 1–3 days on site.

Sets for communities

Large climbing structures where many kids can play at once.

What you get at handover

  • Layout plan with use zones
  • Use, inspection and maintenance instructions
  • Accessibility notes (routes and surfacing) where required
  • Product documentation and installation records
  • Warranty certificate

Request a project quote

Tell us about your site; we’ll review it and get back to you.

E.g. 40 × 30 ft. Leave blank if you’re not sure.

PDF, DWG, JPG or PNG · max 10 MB

Age groups (optional)